Page 80 - Mathematics_Form_3
P. 80

Linear programming


                Exercise 3.2
               1.  Find a graphical solution of             (g)
                    each of the following  linear
                    programming problems:
          FOR ONLINE READING ONLY
                    (a)
                                                            (h)






                    (b)


                                                      2.  A lightweight mountain tents
                                                         manufacturing company produces
                                                         a standard and an expedition
                                                         model. Each standard tent requires
                    (c)  Minimize
                                                         1 hour of cutting and 3 hours of
                                                         assembling. Each expedition tent
                                                         requires 2 hours of cutting and 4
                                                         hours assembling. The maximum
                                                         labour hours available per day in
                    (d)                                  the cutting department and the
                                                         assembling department are 32 and
                                                         84, respectively. If the company
                                                         makes a profit of Tshs 10,950 on
                                                         each standard tent and Tshs 12,750
                                                         on each expedition tent, apply the
                    (e)                                  graphical method to determine the
                                                         number of tents of each type that
                                                         should be manufactured each day
                                                         to maximize the daily profit.              Mathematics for Secondary Schools
                                                      3.  A firm makes two products, P  and
                    (f)                                                              1
                                                         P , and has production capacity
                                                           2
                                                         of 18 tonnes per day. Product P
                                                                                         1
                                                         requires a production capacity of 2
                                                         tonnes per day, while  product  P
                                                                                         2
                                                         requires a production capacity of
                                                         1 tonne per day. Each tonne of  P
                                                                                         1



                 Student\s Book Form Three          73



                                                                                          18/09/2025   09:59:13
     MATHEMATIC F3 SB.indd   73                                                           18/09/2025   09:59:13
     MATHEMATIC F3 SB.indd   73
   75   76   77   78   79   80   81   82   83   84   85