Page 199 - Computer_Science_F5
P. 199

Computer Science  Step 8: Crimp plug           Aim:
                                                         Activity 3.12:
            Secure wires: Ensure the jacket  is
                                                      Crossover Cable Construction
            inside the plug for stress relief. Crimp
            the plug to secure the wires and
          FOR ONLINE READING ONLY
                                                      To construct and test a functional
            complete the connection.
                                                      Ethernet  crossover  cable  using
                                                      T568-A and T568-B wiring standards.
            Step 9: Repeat process
                                                      Materials:
            Second End: Repeat steps 3 to 8 for
            the other end of the cable, using the     Stranded CAT 5, CAT 5e, or CAT 6
                                                      UTP cable;  RJ-45 plugs; Crimping
            same wiring scheme.                       tool;  Cable  stripper;  Cable tester;

                                                      Measuring tape; and Wire cutters OR
            Step 10: Test cable                       Computer and Simulation  software

            Verify  functionality:  Test  the  cable   (Such as Cisco Packet Tracer, GNS3)
            with a cable tester. Have the instructor   Instructions
            check the cable to ensure it functions    Use the following steps (1 to 10) to:
            properly.                                 (a) Build: Create a Category 5 (CAT 5),
                                                         Category 5e (CAT 5e), or Category
            Deliverables                                 6 (CAT 6) Unshielded Twisted Pair

             (a) Completed cable: A fully functional,    (UTP) Ethernet crossover cable.
                properly constructed CAT 5, 5e, or    (b) Test: Ensure proper continuity,
                6 Ethernet patch cable.                  correct pinouts, and wire placement.

             (b) Test results: Documentation of       Step 1: Wire standards
                the cable test results, confirming    Wire one end of the cable  to the
                correct continuity and pinouts.       T568-A standard and the other end
                                                      to  the  T568-B  standard  to  cross the
             (c) Instructor verification: Approval    transmit and receive pairs.

                from the instructor confirming the    Step 2: Measure length
                cable’s proper functionality.
                                                      Measure the required length between
             (d) Written report including relevant    devices,  adding  30.48  cm  (12  in.)

                diagrams and screenshorts if using    for  flexibility.  Standard  lengths  are
                simulation.                           typically 1.83 m (6 ft) or 3.05 m (10 ft).
                                                      Step 3: Cut cable
            Put all your documents in a               Cut a piece of stranded UTP cable to
            portifolio.                               the measured length.


                                                 190
                                                                for Advanced Secondary Schools



     Computer Science Form 5.indd   190                                                     23/07/2024   12:33
   194   195   196   197   198   199   200   201   202   203   204